BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//WATCH LINE 5 - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:WATCH LINE 5
X-ORIGINAL-URL:https://watchline5.com
X-WR-CALDESC:Events for WATCH LINE 5
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Detroit
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Detroit:20250819T180000
DTEND;TZID=America/Detroit:20250819T200000
DTSTAMP:20260509T115829
CREATED:20250802T231039Z
LAST-MODIFIED:20250802T231559Z
UID:422-1755626400-1755633600@watchline5.com
SUMMARY:Virtual MI EGLE Public Hearing
DESCRIPTION:MI EGLE is hosting a Public Hearing for Enbridge’s  application to fill and construct in wetlands and place a water intake structure in Lake Michigan to facilitate the construction of the Line 5 Tunnel Project. \nThe permits are under the authority of Part 303\, Wetlands Protection and Part 325\, Great Lakes Bottomlands\, of the Natural Resources and Environmental Protection Act (NREPA). The applicant proposes to grade\, construct\, and maintain uses in 1.53 acres of wetlands in Mackinac County on Point LaBarbe. Activities include building construction\, construction laydown areas\, tunnel portal construction\, and road improvements within wetlands. Additionally\, a water intake structure is proposed in Emmet County on McGulpin Point with associated Lake Michigan bottomland impact. This includes a pipe extension where the intake line exits the lake bottom\, and the intake structure which is proposed to be placed on a precast concrete pad. Up to 15 concrete ballasts\, to weigh the intake pipe and structure to the lake bottom are also proposed. The water intake structure is proposed to remain on Lake Michigan bottomlands for the duration of construction\, and all bottomland impacts from the intake are proposed to be eliminated following construction. The project is located in T39N\, R04W\, Section 10\, Wawatam and T40N\, R04W in Moran Township\, Emmet and Mackinac County\, Michigan. \nRegister and see more event details on the Zoom Webinar registration website. \nAfter registering\, you will receive an email from “EGLE Outreach” with a link for you to use to join the online hearing. Pre-registration is not required to attend. Individuals interested in participating can click on the registration link (https://bit.ly/4lzO1XF) at the start of the event (6:00 p.m.). \nFor more information\, please visit the MI EGLE website. \nAdditional information can be found and comments can also be made through EGLE’s MiEnviro database at https://mienviro.michigan.gov/ncore (click on “Public Notice Search” then search under EGLE Application/Submission HQ3-8BYB-N9DT1).
URL:https://watchline5.com/event/virtual-mi-egle-only-verbal-public-comment/
CATEGORIES:Legal/Hearings
END:VEVENT
END:VCALENDAR