BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//WATCH LINE 5 - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:WATCH LINE 5
X-ORIGINAL-URL:https://watchline5.com
X-WR-CALDESC:Events for WATCH LINE 5
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20250309T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20251102T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20260308T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20261101T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20270314T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20271107T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20260416T100000
DTEND;TZID=America/Chicago:20260416T190000
DTSTAMP:20260506T111427
CREATED:20260415T013515Z
LAST-MODIFIED:20260416T204338Z
UID:16378-1776333600-1776366000@watchline5.com
SUMMARY:Day of Resistance: Water Protector Gathering
DESCRIPTION:Come to Wikdal Park for potluck and music until 7 pm! Bring banners and signs!\nThere will also be music and a DJ at the Bohemian Hall at 319 11th Ave E\, Ashland until 10 pm.
URL:https://watchline5.com/event/day-of-resistance-water-protector-gathering/
LOCATION:Wikdal Park\, bayfield st and 3rd av west\, Washburn\, Wisconsin
ATTACH;FMTTYPE=image/jpeg:https://watchline5.com/wp-content/uploads/2026/04/resistl5-flyer.jpeg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20260416T130000
DTEND;TZID=America/Chicago:20260416T130000
DTSTAMP:20260506T111427
CREATED:20260415T012750Z
LAST-MODIFIED:20260415T012750Z
UID:16371-1776344400-1776344400@watchline5.com
SUMMARY:Day of Resistance: Appeals Hearing on the Contested DNR Permits for the Line 5 Re-Route
DESCRIPTION:There will be a silent gathering outside the courthouse
URL:https://watchline5.com/event/day-of-resistance-appeals-hearing-on-the-contested-dnr-permits-for-the-line-5-re-route/
LOCATION:Bayfield County Courthouse\, 117 E 5th st.\, Washburn\, WI\, United States
ATTACH;FMTTYPE=image/jpeg:https://watchline5.com/wp-content/uploads/2026/04/resistl5-flyer.jpeg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20260416T130000
DTEND;TZID=America/Chicago:20260416T150000
DTSTAMP:20260506T111427
CREATED:20260310T184631Z
LAST-MODIFIED:20260410T120552Z
UID:1513-1776344400-1776351600@watchline5.com
SUMMARY:Line 5 Reroute Hearing
DESCRIPTION:Pack the courtrooms to attend the Line 5 Reroute hearing!\nThis hearing is in response to the Bad River Band’s appeal of the WDNR permit for the re-route of Line 5. It will address the Band’s request for a stay on construction while the court case is open. The Bad River Band is continuing to object to the WDNR permitting of the LIne 5 reroute and the case is now being heard by Bayfield County’s Judge Anderson.\nThere is no public comment opportunity during these proceedings. Instead lawyers representing Bad River and lawyers from the WDNR and Enbridge will be presenting their cases to Judge Anderson for a decision. \nLocation: Bayfield County Courthouse with live streaming to the Iron County Courthouse. No virtual option\nPlease see the flyer for more details. \nDetails on the rules set by Judge Anderson regarding public access and media access: \n“Except for designated media representatives\, the general public will be prohibited from operating any electronic devices..”    ” Representatives of the media who wish to take still photographs of the proceedings must have permission from the Court prior to the hearing. “.. “No person\, including media representative\, shall be allowed to record by video or audio” \nAll media requests should be submitted more than 72 hours prior to the hearing. Iron County media coordinator:\nMichael Baldwin\, KBJR\n246 S Lake Ave\nDuluth\, MN 55802\n(218)481-6212\nmbaldwin@kbir6.com \nBoth the Bayfield and Iron County courtrooms will be open to the public during any hearing at which Judge Anderson will appear remotely. Seating is limited in both courtrooms and the safe room capacity in each will not be exceeded. Due to the number of attorneys and parties and the need for a more robust video conference and presentation system than currently exists in the Iron County courtroom\, in- person appearances by lawyers and parties will be in the Bayfield County courtroom. \n\nWith that\, there is an opportunity for folks who are interested in taking on an independent media role to get a press pass. If you’re interested\, email southshorewaterprotectors@proton.me \nAs defined by law (Constitution and Bill of Rights)\, journalists with an official press pass have additional protection while working at actions. The designation also provides for privacy related to their “source” of information. It is time a Water Protectors’ News Team be established. The first step is to identify a small diverse group interested in obtaining an official Press Pass. We have identified a legally registered news outlet willing to issue the pass. If you are a good writer\, have the ability to move fast to an action/event\, critically observe/document and are skilled at using the wide array of platforms for getting news out\, you are needed!\n\n\n\n\n 
URL:https://watchline5.com/event/line-5-reroute-hearing/
LOCATION:Bayfield and Iron County Courthouses
CATEGORIES:Community Events,Legal/Hearings
ATTACH;FMTTYPE=image/jpeg:https://watchline5.com/wp-content/uploads/2026/03/meetingposter.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20260416T170000
DTEND;TZID=America/Chicago:20260416T170000
DTSTAMP:20260506T111427
CREATED:20260415T015925Z
LAST-MODIFIED:20260415T015925Z
UID:16386-1776358800-1776358800@watchline5.com
SUMMARY:Day of Resistance: Ashland Public Works Committee Meeting
DESCRIPTION:Make a public comment regarding the city of Ashland selling water to Enbridge to construct Line 5! \nThe public works committee meeting will take place in City Council Chambers at City Hall. \nTo join virtually\, go to this meeting link. If joining fro your phone\, you must first download the GoTo app to open the link. \nSend written Public Comments to\nJohn Butler – jbutler@coawi.org\nDavid Garrington – dgarrington@coawi.org\nAshland Mayor – Matthew Mackenzie – mmackenzie@coawi.org
URL:https://watchline5.com/event/day-of-resistance-ashland-public-works-committee-meeting/
LOCATION:Ashland City Hall\, 601 Main st West\, Ashland\, Wisconsin
ATTACH;FMTTYPE=image/jpeg:https://watchline5.com/wp-content/uploads/2026/04/resistl5-flyer.jpeg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20260416T170000
DTEND;TZID=America/Chicago:20260416T170000
DTSTAMP:20260506T111427
CREATED:20260321T190649Z
LAST-MODIFIED:20260415T014130Z
UID:1651-1776358800-1776358800@watchline5.com
SUMMARY:Ashland Public Works Committee Meetings: RESCHEDULED
DESCRIPTION:City of Ashland selling water to Enbridge\nEnbridge has approached the City of Ashalnd Public Works Committee about selling water to Enbridge for the construction of the Line 5 reroute project. On Feb. 11\, 2020 the City Council unanimously passed a Resolution “to support the efforts of the Bad River Band of Lake Superior Chippewa to remove the Enbridge Line 5 pipeline from the Bad River Watershed.” To be an ally\, our actions must align with our words and selling water to Enbridge goes against the Bad River Bands efforts to remove the pipeline from the watershed.\nSee attached flier and this update post for more background information. \nPublic Works Committee Meetings: 5:00 pm on 4/16\, 5/14\n(Note that this meeting was rescheduled from 4/9).\nHere is the consistent meeting link to public works meetings.\nCheck for more meeting details at City of Ashland Public Meeting Portal website.\nCheck here for meeting Agendas and Minutes. \nAdditionally City of Ashland will host the following:\nCity Council Meetings: 6pm on 3/31\, 4/7\, 4/21\, 5/21\, 5/26
URL:https://watchline5.com/event/ashland-public-works-committee-meetings/
CATEGORIES:Legal/Hearings
ATTACH;FMTTYPE=image/jpeg:https://watchline5.com/wp-content/uploads/2026/03/publicworks-resched.jpeg
END:VEVENT
END:VCALENDAR